top of page

TimberXP | CLT Cantilevering Structure



We've recently completed a challenging mass timber project, a major milestone in our pursuit of engineering excellence. Tasked with engineering a unique house in a seismic zone with a shallow water table, we faced a daring 3-meter cantilevering second floor.

Managing all aspects from structural engineering to on-site work, the entire construction is made from CLT, showcasing our commitment to sustainability and innovation.

Advanced engineering techniques were employed to ensure structural integrity and performance, including comprehensive footfall analysis and a full FEA model. We focused on evaluating joint stiffness, controlling SLS vertical deflections, and embraced a DFMA approach to minimize waste.

This achievement highlights TimberXP's dedication to addressing project specifics, regardless of size. From complex structural demands to sustainable materials, we engineer solutions. No challenge is too large or small; our commitment remains in precision, innovation, and client satisfaction.

Explore our recent mass timber project and reach out for detailed presentations, project discussions, or collaborations. TimberXP doesn't just build structures; we engineer lasting solutions.






Comentários


bottom of page